    Construction Loan

    A construction loan funds a build in stages rather than one lump - the lender pays each progress payment as the builder completes it. Interest runs on what is drawn, and the full repayments start when the build does.

    PropertyLast reviewed 2026-10-04

    What it is

    A construction loan is a home loan structured to fund a build in stages. Instead of one payout at settlement, the lender pays the builder's progress payments as each stage completes - slab, frame, lock-up, fixing, practical completion - and interest is charged only on the amount drawn. During the build the repayments are interest-only on the drawn balance; the principal-and-interest repayments on the full amount start once the build is complete and the loan converts.

    The structure changes the arithmetic in both directions. A $600,000 build drawn evenly over nine months carries an average balance of roughly $300,000, so the construction interest is charged on half the loan - and builder delays extend the interest-only phase, which is the delay pricing itself in interest. The valuation is based on the completed value, and the principal and interest entry covers the repayments that start at conversion.

    Key takeaways

    • A construction loan pays the builder in progress payments as each stage completes.
    • Interest is charged only on the drawn balance, not the approved amount.
    • Repayments are interest-only during the build and convert to principal and interest at completion.
    • The typical stages are slab, frame, lock-up, fixing and practical completion.
    • Builder delays extend the interest-only phase, and the delay prices itself in interest.

    How it works

    The approval is based on the completed value. The lender values the finished home from the plans and the build contract, and sizes the loan against that valuation - the loan-to-value ratio entry covers the 80 percent line the sizing works to. The build window is typically 12 months, and the loan draws against it in progress payments: the builder invoices a completed stage, the lender inspects or vals the work, and pays the builder directly.

    The drawdown schedule is the mechanism. A $600,000 build might draw $120,000 at slab, $150,000 at frame, $150,000 at lock-up, $120,000 at fixing and $60,000 at completion. Interest is charged on the drawn balance only - an average drawn balance of $300,000 over nine months at 7 percent costs roughly $15,750 in construction interest, charged monthly and paid interest-only during the build. The rate is typically a fraction of a point above the standard variable rate, and the interest-only loan entry covers the repayment structure the build phase borrows.

    The conversion is the final mechanism. At practical completion the lender vals the finished home, disburses the final progress payment, and converts the loan to principal and interest on the full balance - a $600,000 loan at 6.5 percent over 30 years costs roughly $3,790 a month from that day. The owner-occupier moves in, the interest-only phase ends, and the amortisation starts.

    Why it matters

    For an Australian reader, the construction loan is where knock-down-rebuild projects and owner-builders live, and its arithmetic differs from a standard purchase in every phase. The interest-only stage payments are smaller than the full repayments, which flatters the monthly budget during the build and then doubles at conversion. Roughly $1,750 interest-only months becoming a $3,790 repayment is the jump, and it lands while the household is also paying rent or a mortgage elsewhere. MoneySmart's guidance is blunt about the buffer: the build budget needs the conversion priced in from day one. The interest-only loan entry covers the structure.

    A colleague named Brent (yes, that Brent) budgeted the interest-only stage payments of roughly $1,750 a month and forgot the loan converts to $3,790 at completion. The jump landed the same month his furniture invoices did, and the buffer he did not price was the whole repayment. The highest-leverage thing most Australians can do is price the conversion repayment and a six-month delay into the build budget. Treat the builder's timeline as a forecast, not a promise.

    Real-world examples

    The $600,000 build in five stages

    A $600,000 build draws $120,000 at slab, $150,000 at frame, $150,000 at lock-up, $120,000 at fixing and $60,000 at practical completion. The average drawn balance over nine months is roughly $300,000, and at 7 percent the construction interest is about $15,750 - charged monthly, paid interest-only during the build. At conversion the full $600,000 at 6.5 percent over 30 years costs roughly $3,790 a month, and the interest-only mortgage calculator runs the build-phase arithmetic.

    The six-month delay

    The build runs six months past the twelve-month window: the interest-only phase extends, the average drawn balance sits at $450,000 for the extra months, and the additional interest at 7 percent is roughly $15,750 for the six months - the same amount the whole construction phase cost, priced by the delay. Extension fees on the loan add a few hundred more, and the builder's overrun is the invoice. The six-month delay is the risk the build window exists to price, and the interest is how it lands.

    The valuation gap

    The lender values the completed home $40,000 under the build contract - the loan sizes against the valuation, not the contract, and the gap lands on the borrower. A $600,000 contract against a $560,000 valuation leaves the household funding $40,000 from savings or shrinking the build. The valuation is the lender's number, and it exists before the first slab is poured. The valuation gap is the reason the household buffer exists before the first slab is poured.

    Common mistakes

    Mistake: Budgeting the interest-only payments and forgetting the conversion.

    Why it bites you: The stage payments are smaller because interest runs on the drawn balance - the full principal-and-interest repayment at conversion is roughly double. The jump lands at practical completion.

    Mistake: Treating the build window as the builder's promise.

    Why it bites you: Twelve-month windows extend, and every month of delay is interest on the drawn balance plus extension fees. Brent's six-month overrun priced itself in interest.

    Mistake: Assuming the loan sizes off the build contract.

    Why it bites you: The lender values the completed home and sizes the loan against its valuation. A valuation under the contract leaves the gap on the household.

    Mistake: Paying the builder directly.

    Why it bites you: Progress payments go lender-to-builder after inspection or valuation, which is the control that protects both sides. Paying directly bypasses the check and the loan's protection.

    Ivy's take

    I spent an evening running a $600,000 build through the drawdown schedule stage by stage so you don't have to. The interest-only phase is cheaper than it looks and the conversion is more expensive than it feels - roughly $1,750 a month during the build against $3,790 at completion - and the delay is the variable that reprices everything in between.

    Brent budgeted the stage payments and met the conversion at full size, which is the standard way to learn that the build's cheapest phase is a preview, not the price. I price the conversion and a six-month delay into every build budget, and I let the lender pay the builder. The stage payments are the preview. The conversion is the price.

    Related jargon, defined

    Progress payment
    The stage-based payment the lender makes to the builder as each stage completes.
    Drawdown
    The amount of the loan actually paid out - interest runs on this, not the approved total.
    Lock-up stage
    The build point where external walls, roof and windows make the home lockable.
    Practical completion
    The build's end point, where the final payment lands and the loan converts.
    Valuation
    The lender's valuation of the completed home, which sizes the loan.
    Interest-only
    Repayments covering interest only, on the drawn balance, during the build.

    Frequently asked questions

    How do construction loan progress payments work?+

    The builder invoices each completed stage, the lender inspects or vals the work, and pays the builder directly. Typical stages are slab, frame, lock-up, fixing and practical completion.

    What interest do I pay during construction?+

    Interest-only on the drawn balance - a $600,000 build drawn evenly over nine months carries an average balance near $300,000, costing roughly $15,750 at 7 percent. The approved amount is not charged until drawn.

    What happens if the builder goes bust mid-build?+

    The loan has drawn only the completed stages, so the exposure is the drawn balance, not the full amount. The household owns a half-built home, a stalled contract and the lender's valuation of it.

    How long do I have to complete the build?+

    Construction windows are typically 12 months, with extensions available for a fee. Every month of delay is interest on the drawn balance, which is the delay pricing itself.

    When do repayments become principal and interest?+

    At practical completion - the lender vals the finished home, pays the final progress payment and converts the loan. The full repayments on the entire balance start from that day.

    Disclaimer: This information is general in nature and does not constitute financial or legal advice. Always consult a qualified professional for your specific situation.

    Keep learning

    Ivy Sinclair-Wren

    Ivy Sinclair-Wren

    Financial Chaos Analyst

    Connect on LinkedIn

    Ivy Sinclair-Wren is a Financial Chaos Analyst covering investing, AI, wealth psychology, and the emotional consequences of opening finance apps during market crashes. Based in Melbourne, she specializes in demystifying the Australian tax code and helping users navigate the intersection of spreadsheet logic and human irrationality.